
Development on the Adelaide Wind Energy Centre was started by a subsidiary of TCI Renewables, Inc., Air Energy, TCI (AET) in 2008. In late 2009, NextEra Energy Canada purchased all rights to the projects, however, AET obtained the required permits and consents. This wind energy project has a maximum generating capacity of up to 60 megawatts. The wind farm is located in Middlesex County, with electrical interconnection extending into North Middlesex. At the maximum generating capacity, the Adelaide Wind Energy Centre produces enough energy for approximately 15,000 average homes in Ontario. This project has been awarded a Feed-in-Tariff contract by the Ontario Power Authority and has received the approval from the Ministry of the Environment on its Renewable Energy Approval application. This project is currently operational.
Project Documentation
Acoustic Audit Reports
Spring 2020 Immission Audit Report
Fall 2020 Immission Audit Report
2020 T32 Emission Audit Report
2020 T31 Emission Audit Report
Community Newsletter
Community Newsletter - Spring 2012
ERT Notice Map
Renewable Energy Approval
Renewable Energy Approval Letter
Amendment to Renewable Energy Approval - February 2014
Amendment to Renewable Energy Approval - October 2014
Amendment to Renewable Energy Approval - June 2016
Amendment to Renewable Energy Approval - July 2019
Modification Reports, March 2016
Adelaide Modification Notification March 2016
Adelaide Modification Report March 2016
Project Modification Report - April 2014
Project Modification Report - April 2014, Main Body
Appendix A: MOE Approval to the Bornish REA Amendment
Appendix B: Natural Heritage Addendum - Part 1
Appendix B: Natural Heritage Addendum - Part 2
Appendix B: Natural Heritage Addendum - Part 3
Appendix C: Archaeological Assessment Addendum
Appendix D: Site Plan Maps Originally Approved Part 1
Appendix D: Site Plan Maps Originally Approved Part 2
Appendix D: Site Plan Maps Originally Approved Part 3
Appendix D: Site Plan Maps Originally Approved Part 4
Appendix D: Site Plan Maps Originally Approved Part 5
Appendix D: Site Plan Maps Originally Approved Part 6
Appendix D: Site Plan Maps Originally Approved Part 7
Appendix E: Site Plan Maps Modified
Project Modification Report - February 2014
Project Modification Report - February 2014, Main Body
Ontario Energy Board - Documents
Notice of Application for Electricity Generation License
Kerwood Wind, Inc. has applied to the Ontario Energy Board for leave to construct transmission facilities that will enable the Adelaide Wind Energy Centre to connect to the Ontario power system. Copies of the Notice of Application and Hearing, as well as the Application for Leave to Construct can be found below. Note that the decision below applies to both Kerwood Inc.'s application and the co-owner's applications described below.
Kerwood Wind, Inc. is also a co-owner of proposed shared transmission facilities that are the subject of a current application before the Ontario Energy Board. The hearing process concluded on October 18, 2013 and the decision of the Ontario Energy Board was issued on November 12, 2013.
Decision and Order of the Ontario Energy Board granting Leave to Construct Transmission Facilities
Notice of Application and Hearing
Kerwood Wind, Inc. - Application for Leave to Construct Transmission Facilities
Original ESR Information
Environmental Screening Report: Volume 1 Text
Environmental Screening Report: Volume 2 Figures
Environmental Screening Report: Volume 3 Appendix A
Environmental Screening Report: Volume 4 Appendices B to D
Environmental Screening Report: Volume 6 Appendix E
Environmental Screening Report: Volume 7 Appendices F to H
Project Newsletter, Summer 2009
Public Notice of Environmental Screening Commencement, 2008
Environmental Screening Report (text only)
Notice of Environmental Screening Completion, 2009
Community Liaison Committee
Community Liaison Committee - Meeting #4 - Meeting Summary
Community Liaison Committee - Meeting #4 - Presentation
Community Liaison Committee - Meeting #4 - Notice
Community Liaison Committee - Meeting #3 - Meeting Summary
Community Liaison Committee - Meeting #3 - Presentation
Community Liaison Committee - Meeting #3 - Notice
Community Liaison Committee - Meeting #2 - Meeting Summary
Community Liaison Committee - Meeting #2 - Presentation
Community Liaison Committee - Meeting #2 - Notice
Community Liaison Committee - Meeting #1 - Meeting Summary
Community Liaison Committee - Meeting Notice, December 2013
Community Liaison Committee, Charter
Community Liaison Committee, Membership Application Form
Community Liaison Committee, Advertorial
Report Summaries
Construction Report
Construction Plan Report, Part 1
Construction Plan Report, Part 2
Construction Plan Report, Part 3
Construction Plan Report, Part 4
Construction Plan Report, Part 5
Construction Plan Report, Part 6
Construction Plan Report, Part 7
Construction Plan Report, Part 8
Consultation Report
Consultation Report, Main Text
Project Notices and Newsletters - Appendix A
Project Notices and Newsletters - Appendix A, Part 1
Project Notices and Newsletters - Appendix A, Part 2
Project Notices and Newsletters - Appendix A, Part 3
Agency Consultation - Appendix B
Agency Consultation - Appendix B, Part 1
Agency Consultation - Appendix B, Part 2
Agency Consultation - Appendix B, Part 3
Agency Consultation - Appendix B, Part 4
Agency Consultation - Appendix B, Part 5
Aboriginal Consultation - Appendix C
Aboriginal Consultation - Appendix C, Part 1
Aboriginal Consultation - Appendix C,Part 2
Aboriginal Consultation - Appendix C,Part 3
Aboriginal Consultation - Appendix C,Part 4
Aboriginal Consultation - Appendix C,Part 5
Aboriginal Consultation - Appendix C,Part 6
Aboriginal Consultation - Appendix C,Part 7
Aboriginal Consultation - Appendix C,Part 8
Aboriginal Consultation - Appendix C,Part 9
Aboriginal Consultation - Appendix C,Part 10
Public Consultation - Appendix D
Public Consultation - Appendix D, Part 1
Public Consultation - Appendix D, Part 2
Public Consultation - Appendix D, Part 3
Public Consultation - Appendix D, Part 4
Public Consultation - Appendix D, Part 5
Public Consultation - Appendix D, Part 6
Public Consultation - Appendix D, Part 7
Public Consultation - Appendix D, Part 8
Public Consultation - Appendix D, Part 9
Public Consultation - Appendix D, Part 10
Public Consultation - Appendix D, Part 11
Public Consultation - Appendix D, Part 12
Public Consultation - Appendix D, Part 13
Public Consultation - Appendix D, Part 14
Public Consultation - Appendix D, Part 15
Public Consultation - Appendix D, Part 16
Public Consultation - Appendix D, Part 17
Public Consultation - Appendix D, Part 18
Public Consultation - Appendix D, Part 19
Public Consultation - Appendix D, Part 20
Public Consultation - Appendix D, Part 21
Public Consultation - Appendix D, Part 22
Public Consultation - Appendix D, Part 23
Public Consultation - Appendix D, Part 24
Public Consultation - Appendix D, Part 25
Public Consultation - Appendix D, Part 26
Public Consultation - Appendix D, Part 27
Public Consultation - Appendix D, Part 28
Public Consultation - Appendix D, Part 29
Public Consultation - Appendix D, Part 30
Public Consultation - Appendix D, Part 31
Public Consultation - Appendix D, Part 32
Public Consultation - Appendix D, Part 33
Public Consultation - Appendix D, Part 34
Public Consultation - Appendix D, Part 35
Public Consultation - Appendix D, Part 36
Public Consultation - Appendix D, Part 37
Public Consultation - Appendix D, Part 38
Public Consultation - Appendix D, Part 39
Public Consultation - Appendix D, Part 40
Public Consultation - Appendix D, Part 41
Municipal Consultation - Appendix E
Municipal Consultation - Appendix E, Part 1
Municipal Consultation - Appendix E, Part 2
Municipal Consultation - Appendix E, Part 3
Municipal Consultation - Appendix E, Part 4
Decommissioning Report
Design and Operations Report
Main Text and Site Plan, Table A-1
Site Plan - Appendix A
Turbine Specification Report - Appendix B
Archaeological Assessment Report - Appendix C
Stage 1 Report
Stage 2 Report
Stage 2 Revised Report
Stage 2 Revised Report, Part 1
Stage 2 Revised Report, Part 2
Stage 2 Revised Report, Part 3
Stage 2 Revised Report, Part 4
Stage 2 Revised Report, Part 5
Stage 2 Revised Report, Part 6
Stage 2 Revised Report, Part 7
Stage 2 Revised Report, Part 8
Stage 1 and 2 Revised Report for Parkhill Substation
Stage 1 and 2 Revised Report for Parkhill Substation, Part 1
Stage 1 and 2 Revised Report for Parkhill Substation, Part 2
Stage 1 and 2 Revised Report for Parkhill Substation, Part 3
Stage 1 and 2 Revised Report for Parkhill Substation, Part 4
Stage 1 and 2 Revised Report for Parkhill Substation, Part 5
Heritage Assessment Reports - Appendix C
Heritage Assessment Report
Heritage Assessment Report, Part 1
Heritage Assessment Report, Part 2
Heritage Assessment Report, Part 3
Heritage Assessment Report, Part 4
Heritage Assessment Report, Part 5
Heritage Assessment Report Addendum
Heritage Assessment Report Addendum, Part 1
Heritage Assessment Report Addendum, Part 2
Heritage Assessment Report Addendum, Part 3
Heritage Assessment Report Addendum, Part 4
Heritage Assessment Report Addendum, Part 5
Heritage Assessment Report Addendum, Part 6
Natural Heritage Assessment Report - Appendix D
Record Review Report, Main Text
Record Review Report, Appendix
Site Investigation Report
Site Investigation Report, Main Text, Part 1
Site Investigation Report, Main Text, Part 2
Site Investigation Report, Main Text, Part 3
Site Investigation Report, Main Text, Part 4
Site Investigation Report, Appendix, Part 1
Site Investigation Report, Appendix, Part 2
Site Investigation Report, Appendix, Part 3
Site Investigation Report, Appendix, Part 4
Site Investigation Report, Appendix, Part 5
Site Investigation Report, Appendix, Part 6
Site Investigation Report, Appendix, Part 7
Site Investigation Report, Appendix, Part 8
Site Investigation Report, Appendix, Part 9
Evaluation of Significance Report
Evaluation of Significance Report, Main Text, Part 1
Evaluation of Significance Report, Main Text, Part 2
Evaluation of Significance Report, Main Text, Part 3
Evaluation of Significance Report, Appendix
Environmental Impact Study Report
Environmental Impact Study Report, Part 1 (1)
Environmental Impact Study Report, Part 2 (1)
Environmental Impact Study Report, Part 3 (1)
Water Assessment and Water Body Report - Appendix E
Record Review Report
Site Investigation Report
Site Investigation Report, Part 1
Site Investigation Report, Part 2
Site Investigation Report, Part 3
Site Investigation Report, Part 4
Site Investigation Report, Part 5
Site Investigation Report, Part 6
Site Investigation Report, Part 7
Environmental Impact Study Report
Environmental Impact Study Report, Part 1 (2)
Environmental Impact Study Report, Part 2 (2)
Environmental Impact Study Report, Part 3 (2)
Environmental Impact Study Report, Part 4
Noise Impact Assessment Report - Appendix F
Noise Impact Assessment Report
Turbine Specifications - Appendix G
Property Setback Assessment- Appendix H
Project Description Report
Project Description Report, Part 1
Project Description Report, Part 2
Project Description Report, Part 3
Shadow Flicker Assessment Report
Shadow Flicker Assessment Report
Draft Site Plan Report
Design Change Summary Report
Main Text and Modified Design Maps (App A)
MTCS and MNR Confirmation Letters (App B)
Built Heritage Addendum B - Appendix C
Built Heritage Addendum B - Appendix C, Part 1
Built Heritage Addendum B - Appendix C, Part 2
Built Heritage Addendum B - Appendix C, Part 3
Built Heritage Addendum B - Appendix C, Part 4
Built Heritage Addendum B - Appendix C, Part 5
Built Heritage Addendum B - Appendix C, Part 6
Built Heritage Addendum B - Appendix C, Part 7
Built Heritage Addendum B - Appendix C, Part 8
Built Heritage Addendum B - Appendix C, Part 9
Built Heritage Addendum B - Appendix C, Part 10
Built Heritage Addendum B - Appendix C, Part 11
Built Heritage Addendum B - Appendix C, Part 12
Built Heritage Addendum B - Appendix C, Part 13
Built Heritage Addendum B - Appendix C, Part 14
Built Heritage Addendum B - Appendix C, Part 15
Built Heritage Addendum B - Appendix C, Part 16
Additional Archaeology for Parkhill Substation - Appendix D
Additional Archaeology for Parkhill Substation - Appendix D, Part 1
Additional Archaeology for Parkhill Substation - Appendix D, Part 2
Additional Archaeology for Parkhill Substation - Appendix D, Part 3
Additional Archaeology for Parkhill Substation - Appendix D, Part 4
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 1
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 2
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 3
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 4
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 5
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 6
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 7
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 8
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 9
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 10
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 11
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 12
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 13
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 14
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 15
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 16
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 17
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 18
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 19
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 20
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 21
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 22
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 23
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 24
Additional Archaeology for Adelaide Wind Energy Centre - Appendix E, Part 25
Natural Heritage Addendum - Appendix F
Natural Heritage Addendum - Appendix F, Part 1
Natural Heritage Addendum - Appendix F, Part 2
Natural Heritage Addendum - Appendix F, Part 3
Natural Heritage Addendum - Appendix F, Part 4
Natural Heritage Addendum - Appendix F, Part 5
Natural Heritage Addendum - Appendix F, Part 6
Natural Heritage Addendum - Appendix F, Part 7
Natural Heritage Addendum - Appendix F, Part 8
Natural Heritage Addendum - Appendix F, Part 9
Natural Heritage Addendum - Appendix F, Part 10
Natural Heritage Addendum - Appendix F, Part 11
Natural Heritage Addendum - Appendix F, Part 12
Turbine Visualization Images
Project as viewed from Egremont Drive
Project as viewed from Brown Road
Project as viewed from the intersection of Kerwood Road and Napperton Drive
Project as viewed from 100-metres south of Centre Road and Mulifarry Drive
Bird and Bat Monitoring
Adelaide 2015 Monitoring Summary
Adelaide 2016 Monitoring Summary
Adelaide 2017 Monitoring Summary
REA Amendment 2019